Wall putty production line of Argentine customer — POLYC MACHINE turnkey project view

Quick answer: POLYC built two lines for an Argentine customer: a wall putty line and a 5000L kettle and cartridge fillers. Putty ~50,000 cps, built to spec. Since 2006.

In short

An Argentine customer purchased two complete production lines from POLYC. The first is a wall putty line; the second combines a 5,000 L concentric double-shaft mixing kettle with two cartridge high-viscosity filling machines, covering coatings, putty and paint. The putty runs at about 50,000 cps, and both lines were customised to the customer's engineering drawings.

Wall putty production line at about 50,000 cps: a 5,000 L concentric double-shaft kettle for the high-solid batch, then dispersion, vacuum deaeration, discharge and cartridge filling.
The putty runs at about 50,000 cps. Line two uses a 5,000 L concentric double-shaft kettle for the high-solid batch, followed by dispersion, vacuum deaeration, then discharge and automated cartridge filling.

Key Takeaways

  • An Argentine customer ordered two lines in one contract
  • Line 1 is wall putty; line 2 is a 5,000 L concentric double-shaft kettle
  • Anchor plus intermediate disc was chosen over two high-speed shafts
  • Cartridge filling automation covers six stations in one machine

Two Lines, One Order: The Plant Logic

Buying two lines at once is unusual, and it changes the engineering brief. The customer was not adding a machine to an existing process; they were building a plant that had to produce three product families — putty, paint and coatings — with a shared filling hall and a shared maintenance team.

That framing produced a specific split:

ItemArgentine order
Line 1Wall putty production line
Line 25,000 L concentric double-shaft kettle + 2 cartridge high-viscosity fillers
Putty viscosity≈ 50,000 cps
ProductsCoatings, putty, paint
CustomisationTo customer engineering drawings

Line 1 owns the paste duty. Line 2 owns the high-solid liquid duty and the packaging end. Splitting by rheology rather than by product name is the important decision: putty at 50,000 cps and a high-solid coating at a few thousand cps cannot share a mixing vessel efficiently, but they can share a building, a warehouse and a maintenance team.

Line 1: The Wall Putty Line

The putty line is built around butterfly double-shaft mixers — two units of different capacities, so the volume grade and the short colour runs do not compete for the same vessel. The spiral blade profile folds the paste rather than slicing it, which is what a 50,000 cps material needs.

Downstream, the line pairs a pressing machine with the filling machine through an interlock: the pressing plate receives a signal from the filler, squeezes by a set amount, and both motions stop together at the target weight. That removes the manual trimming step that otherwise spills paste over the bucket rim on every fill.

The full process route is liquid charging and wetting, dispersion, vacuum deaeration, hydraulic discharge, then pressing and filling. Vacuum deaeration matters more than it looks: a stiff paste traps air during powder addition, and that air becomes pinholes on the trowel and volume shortfall in the pail.

Line 2: The 5,000 L Concentric Double-Shaft Kettle

Line 2's core is a 5,000 L concentric double-shaft kettle with an anchor blade and an intermediate dispersing disc. The customer's second product is a high-solid coating produced at several thousand litres per batch, which is exactly the duty this combination is designed for.

Concentric means the dispersing shaft runs inside the hollow low-speed shaft that carries the anchor. Both are driven independently, on one centreline. In operation:

  • The anchor sweeps the wall and bottom, keeping the entire batch in motion and preventing the wall film that otherwise skins and contaminates the next batch.
  • The intermediate disc creates a local high-shear zone to wet out and break down agglomerates in the material passing through it.
  • The shared centreline means one lid opening, symmetric geometry, and a vessel that is straightforward to clean.

A 5,000 L batch is a serious batch. At typical high-solid densities, it is several tonnes of material per mix, which makes two things non-negotiable: adequate cooling, and a discharge arrangement that actually empties the vessel. Both are specified at the quotation stage, not retrofitted.

Why Anchor Plus Intermediate Disc, Rather Than Two High-Speed Shafts

The alternative to a concentric anchor-and-disc arrangement is a dual high-speed disperser — two saw-tooth discs at different heights. It is cheaper and, for some products, entirely adequate. It fails on high-solids coatings for a specific reason.

Two high-speed discs both create local shear zones. In a high-solids batch, the material between and around those zones is too viscous to flow into them quickly, so the batch develops a well-mixed region near the discs and a stagnant region everywhere else. The result is a product with variable fineness depending on where in the vessel the sample came from.

An anchor changes that. Because it moves the entire vessel volume, material is continuously delivered into the disc's shear zone, so the disc works on the whole batch over time rather than on the portion that happens to reach it. The disc can then be smaller and slower than a standalone disperser would need to be, which reduces heat input — the other limiting factor on high-solids dispersion.

Cartridge Filling Automation: Six Stations in One Machine

The most distinctive equipment on this order is not a mixer. The customer packs two products into plastic cartridges and cans, and the standard answer — a semi-automatic filler and four people — would not support the volume. POLYC therefore customised the filler to automate the full sequence:

  • Lid sorting — lids oriented and fed in step with the cartridges, so the operator is not handling them.
  • Filling — metered by volume or weight depending on the product, with the paste fed under pressure because a high-viscosity product will not flow by gravity.
  • Sealing — lid pressed home to a repeatable depth, which is what prevents leaks in transit.
  • Punching — the nozzle or vent feature formed in the sealed lid.
  • Date printing — batch and expiry marked in the same pass, so traceability does not depend on a separate manual step.
  • Cartridge sorting — finished cartridges oriented and delivered to the packing station.

The economic argument for automating all six is not labour alone. A semi-automatic line produces variable seal quality, and a leaking cartridge discovered by a builder is a warranty claim and a lost account. Mechanising the seal and the punch makes quality independent of how tired the operator is at the end of a shift.

Cartridge, Can or Pail: Why the Pack Drives the Machine

Packaging choice is usually made by marketing, but it constrains the filling equipment, so it belongs in the engineering conversation. The three common formats for putty and high-solid coatings behave very differently on a line:

PackFill methodLine implications
Plastic cartridgePressure fill, lid seal, punchHighest automation potential; seal quality is critical
Metal canPressure fill, lid crimp or pressNeeds can-handling and crimping; heavier, slower
Plastic pailPress fill with weight controlLargest fill weight; press-fill interlock essential

Supplying two cartridge fillers alongside the kettle, rather than one, reflects a throughput calculation: the filling station is usually the bottleneck on a high-viscosity line, because paste moves slowly through a nozzle no matter how fast the mixer is. Two fillers let one kettle feed a packing hall that can keep up with it.

Multi-Product Changeover on a Two-Line Plant

A plant running coatings, putty and paint has changeovers in three places, and each has a different cost:

  • Vessel changeover — the dominant cost. A paste vessel needs physical cleaning, not a rinse, and the wall film is the part that takes the time.
  • Filling changeover — pack format changes, fill weight changes, and the product line from the filler nozzle to the container has to be purged.
  • Colour changeover — the one that most affects quality, because residue from a dark batch in a light product is visible immediately.

The design response is not to make changeovers faster in the abstract but to allocate products so changeovers are rarer: paste on line 1, high-solid liquid on line 2, and within each line a sequence that runs light to dark rather than alternating. Sequencing is free; cleaning is not.

Customisation and Drawing Control

Both lines were built to the customer's engineering drawings, which means the working relationship starts with a drawing review rather than a product catalogue. The checks that matter on a two-line order:

  • Interface between the lines. Shared filling hall, shared services, shared access — the drawings have to be read together, not separately.
  • Consistency of standards. If line 1 uses one flange standard and line 2 another, the maintenance store doubles. Unifying them is a small decision with a long tail.
  • Deviation list. Where a drawing detail would not work — an agitator undersized for the torque, a discharge that cannot drain, a clearance that ignores shaft lift — raise it before manufacture.
  • As-built documentation. The customer should receive drawings that match what was shipped, and a spare-parts list keyed to those drawings.

Shipping, Installation and Commissioning

A two-line order ships as a sequence, not a single delivery, and the installation order matters: the 5,000 L kettle has to be placed before the building is closed in, because it will not fit through a finished doorway afterwards.

What the customer needs before the first container arrives:

  • Foundation and anchor-bolt drawings issued early enough for civil works.
  • A layout showing vessel positions, access aisles, and clearance for lifting the disperser shaft and for opening the kettle lid.
  • A utility schedule — power, cooling water, compressed air, extraction — with capacities, not just pipe sizes.
  • An installation sequence that places the largest items first.

Commissioning on a paste line is where the operating parameters get set: press-fill timing, vacuum cycle, dispersion time to target fineness. Those numbers belong in a written handover document, because the next shift will not remember them and the next campaign will need them again.

Frequently Asked Questions

What did POLYC build for the Argentine customer?

Two lines: a wall putty line with butterfly double-shaft mixers, and a high-solid line built around a 5,000 L concentric double-shaft kettle with two cartridge high-viscosity fillers.

Why a concentric kettle with an anchor and an intermediate disc?

The anchor moves the entire batch so material is continuously fed into the disc's shear zone. Two high-speed discs alone would leave stagnant regions in a high-solids batch.

What does the cartridge filler automate?

Lid sorting, filling, sealing, punching, date printing and cartridge sorting — the full sequence, so seal quality does not depend on manual handling.

Why two cartridge fillers rather than one?

Filling is usually the bottleneck on a high-viscosity line. Two fillers let one kettle feed a packing hall that can keep pace with it.

Can the same plant run putty, paint and coatings?

Yes, by splitting duties by rheology: paste on the putty line, high-solid liquid in the concentric kettle. Sharing a building and a maintenance team is sensible; sharing one mixer for both is not.

Can POLYC build to our drawings?

Yes. POLYC manufactures to customer drawings and issues a deviation list where a detail would not work in practice, together with as-built documentation on delivery.

What has to be planned before the equipment arrives?

Foundations, layout with lifting clearances, utilities with capacities, and an installation sequence that places the largest vessels first — the 5,000 L kettle will not fit through a finished doorway later.

Talk to a POLYC Engineer

POLYC MACHINE has delivered 8,000+ systems to 80+ countries since 2006. Share your coating and putty process for a customised line.

Request a Quote

Source: POLYC MACHINE — Shanghai Polyc Technology Co., Ltd. (polyc.site), manufacturer of wet grinding, dispersion and mixing equipment for coatings, inks, adhesives and battery materials since 2006.

Related technical guides

Standards referenced

Method references used by process engineers when specifying and verifying the operations described in this guide.

  • ISO 1524:2020 — Paints, varnishes and printing inks — Determination of fineness of grind
  • ISO 1513 — Paints and varnishes — Examination and preparation of test samples
  • ISO 2808 — Paints and varnishes — Determination of film thickness
  • ISO 2431:2019 — Paints and varnishes — Determination of flow time by use of flow cups
Get a Quote →WhatsApp
Chat on WhatsApp