REQUEST A QUOTATION

How to Request a Quote: RFQ Checklist for Grinding & Mixing Equipment

A complete RFQ lets us size equipment, define scope and return a comparable quotation without several rounds of clarification.

A complete RFQ lets us size equipment, define scope and return a comparable quotation without several rounds of clarification.

Send us your product or formulation type, annual or batch capacity, viscosity range, target fineness, solvent or water basis, plant dimensions and ceiling height, power supply and explosion-protection needs, destination port and Incoterm. We return an itemised equipment quotation and, where relevant, a separate turnkey total.

Why a Complete RFQ Changes the Quote

A quotation for wet grinding and mixing equipment is a configuration exercise, not a price lookup. The same bead mill or disperser is specified differently for a 5,000 cps coil coating premix than for a low-viscosity ink, because motor power, seal design, vessel geometry, media size and downstream filtration all follow from the process data.

When the first enquiry omits capacity, viscosity or target fineness, the only honest answer is a request for more information. That costs both sides several rounds before any technical discussion starts. Publishing the inputs we need lets a project engineer assemble them once, before the first email.

This page is the entry point for a turnkey project process; it describes what to send and what comes back. It does not publish prices, and it does not replace a project-specific proposal.

The Eight Inputs We Need

Bring these eight items together and we can size equipment, define scope and produce a comparable quotation. Where a value is not yet fixed, give a range and the reason it is open — a range is still usable for sizing.

#InputWhy it drives the configurationIf it is missing
1Product / formulation typeDetermines wetted materials, seals, cleaning and whether explosion protection appliesWe cannot select contact materials
2Annual capacity or batch volumeSets vessel size, number of parallel units and duty cycleEquipment may be undersized or oversized
3Viscosity range (before and after)Determines agitator type, motor power and whether a high-viscosity mixer is neededRisk of stalled batches or poor dispersion
4Target fineness / particle sizeSets mill type, media size and number of passesNo basis for mill selection
5Solvent-based or water-basedDrives explosion protection, sealing and drying or recovery provisionsCompliance and safety scope undefined
6Plant dimensions and ceiling heightDetermines layout, vessel height, lifting structure and accessLayout drawings cannot be produced
7Power supply and site classificationMotor voltage, frequency and hazardous-area classificationElectrical scope must be reworked later
8Destination port and IncotermPacking, shipping scope and commercial boundaryFreight and insurance cannot be quoted

For help deriving capacity and specification values, see the paint production line equipment guide and the ink line capacity planning guide.

What We Send Back

A complete enquiry receives a structured response rather than a single number:

  • An itemised equipment list with model references and quantities.
  • A separate turnkey total where installation, commissioning and training are in scope.
  • Capacity calculation showing the assumed batch size, cycle time and annual output.
  • A proposed plant layout indicating equipment positions, material flow and access.
  • Manufacturing and delivery period, packing method and shipping boundary.
  • Warranty scope, recommended spare parts and after-sales support arrangements.
  • Reference projects of a comparable process, where available.

Prices are provided only in a project-specific commercial proposal. We do not publish a price list, because the same model can be configured quite differently for different duties.

Equipment Supply vs Turnkey Scope

Customers often ask for equipment supply and a turnkey total to be quoted separately, so the two can be compared. The boundary is straightforward:

In POLYC scopeNormally in the customer scope
Process design and equipment selectionCivil works and building structure
Equipment manufacture and factory testingUtilities to the battery limit (power, water, compressed air)
Export packing and shipping to the agreed Incoterm pointRaw materials, packaging consumables and finished goods handling
On-site installation supervision, commissioning and operator trainingLocal permits, customs clearance and site labour where agreed
Documentation, spare parts list and warranty support

The turnkey production line overview shows how these elements are combined for paint, ink and specialty lines.

Incoterms, Packing and Destination

EXW, FOB and CIF place the cost and risk boundary at different points. Naming the destination port and the preferred Incoterm at the enquiry stage avoids a later re-quote, because packing, documentation and insurance differ between them. Large vessels and lifting structures may also require a specific packing method, which is easier to plan when the destination is known from the start.

We do not publish freight rates or prices on this site; these are calculated for the actual shipment and included in the commercial proposal.

Lead Time, Installation and Commissioning

Manufacturing period depends on the equipment list and any custom fabrication. Before shipment, equipment is assembled and checked at the factory; a factory acceptance test can be arranged. After arrival, installation supervision, alignment, utility connection checks, trial batches and operator training follow a defined sequence. The full sequence, with deliverables at each stage, is described in the turnkey project process.

Common Gaps in First Enquiries

The most frequent omissions are capacity, viscosity and target fineness. Others include a missing solvent/water basis, no plant dimensions, and an RFQ sent to several suppliers without process data. In these cases we reply with a short supplementary-data request instead of a quotation — this is faster for both sides than a speculative offer based on assumed conditions.

If you are unsure whether your process is within our equipment scope, check applications and limitations first.

Frequently Asked Questions

What should I send to get an accurate quotation?

The eight inputs listed above: product type, capacity, viscosity, target fineness, solvent or water basis, plant dimensions, power supply and site classification, and destination port with Incoterm.

Do you publish equipment prices online?

No. Prices are provided in a project-specific proposal because configuration depends on process data.

Can I request equipment supply only, without installation?

Yes. Equipment supply and turnkey scope can be quoted separately for comparison.

Which Incoterms do you support?

EXW, FOB and CIF are commonly used; state your preferred term and destination port in the enquiry.

How long does a quotation take?

It depends on how complete the process data is. A complete RFQ avoids several rounds of clarification.

What if I do not know my capacity or viscosity yet?

Give a range and the reason it is open. We can size on a range and refine it during process design.

Get a Quote →WhatsApp
Chat on WhatsApp