Calculate
Energy per tonne = power × load × hours / output × price. Media per tonne = consumption × media price. Total = (energy + media + labour) ÷ (1 − yield loss).
Pesticide SC Line
SC production is energy- and media-intensive compared with most coatings. Enter your rates and output, and the estimator shows cost per tonne and which driver dominates.
Energy per tonne = power × load × hours / output × price. Media per tonne = consumption × media price. Total = (energy + media + labour) ÷ (1 − yield loss).
Specific energy for milling to 2 μm is several times that for milling to 20 μm, and SC products sit at the fine end by definition. A 160 kW installation producing 5,000 t/yr implies roughly 190 kWh per tonne, which at $0.12 is about $23 per tonne — often comparable to the media cost.
That is why SC lines benefit disproportionately from process optimisation: a 20% reduction in specific energy is a direct 20% cut in the largest controllable cost.
Media wear in SC milling is often estimated rather than measured. Weigh the charge at commissioning and again after 1,000 hours: the difference, divided by throughput, gives the real consumption figure. Most plants discover it is higher than the supplier estimate.
For a two-shift operation with cleaning and changeover, yes. Three-shift lines run closer to 7,000.
Filtration to remove oversize crystals, plus cleaning between products, produces more residue than paint production.
Sometimes. Higher-grade zirconia wears more slowly but costs more; the calculation is consumption × price, not price alone.
If your plant treats effluent on site, add it to the running cost. SC residues can be costly to dispose of.