Why the cost structure matters more than the total
Two lines with the same cost per tonne are not equivalent. A line where 60% of cost is media is exposed to media price and wear rate; a line where 60% is labour can be improved by automation and batch size. Breaking the number into drivers tells you which lever to pull.
Media cost is the item most often mis-estimated. A mill running fine media at high energy density can consume several grams per kilogram, and at $25–60 per kilogram that dominates the running cost of a fine ink.
What this estimator deliberately excludes
Capital cost, depreciation, building, utilities other than electricity, and raw material cost are all outside this model. Equipment quotations are configuration-specific — motors, controls, materials of construction and automation all move the price. Use this for the running-cost side of a business case, then combine it with a real quotation for the capital side.
Frequently asked questions
Why do you use 6,000 hours for the energy calculation?
It approximates two shifts over 300 days with realistic downtime. Change the annual output and working days if your schedule differs.
Is 0.75 a fair average load?
For milling equipment running near design flow, yes. Mills that run at part load or with frequent stops are closer to 0.5.
Should I include cleaning and solvent losses?
Yes, and the simplest way is through the yield loss figure. Solvent-based lines typically lose 2–5% to cleaning and changeover.
Can I compare two mill technologies with this?
Yes if you enter the power and media consumption for each. The technology with lower media consumption often wins even at higher installed power.