PAINT & COATING PRODUCTION LINE

Complete Paint & Coating Production Line

From pigment dispersion to finished coating: engineered for consistency.

PROCESS OVERVIEW

One coordinated route from raw material to finished coating.

01

Material weighing

Meter resins, pigments, fillers, additives, and liquids in the defined batch sequence.

Dispersion equipment →
04

Letdown & tinting

Set final viscosity, shade, solids, and additives in a finishing vessel.

Tinting kettle →
05

Filtration & inspection

Remove oversize contamination and confirm quality before filling.

Bag filter →
06

Filling & packaging

Transfer finished coating to the selected filling and packaging format.

Filling equipment →

EQUIPMENT LIST

Equipment configured around your coating process.

Paint production line equipment list
Process stepEquipmentPOLYC modelCapacity rangeDetails
Pre-dispersionHigh-speed disperserPHR Series50-2,000 LView equipment
Fine grindingBasket millPZM Series0.5-1,000 LView equipment
Fine grinding, large batchHorizontal bead millPZB Series50-1,000 LView equipment
LetdownTinting kettleCustom100-5,000 LView equipment
FiltrationBag filterPBF Series0.5-20 m³/hView equipment
FillingFilling machineCustomConfigured to orderView equipment

COATING TYPE OPTIONS

Select the process route around the coating chemistry.

Industrial Coatings

Suitable for: Anti-corrosion, marine, and container coatings.

Viscosity: 1,000-5,000 mPa·s

Recommended line: High-speed disperser + horizontal bead mill

Focus: High pigment loading and wear resistance.

Architectural Coatings

Suitable for: Latex paints, interior wall coatings, and exterior wall coatings.

Viscosity: 500-3,000 mPa·s

Recommended line: High-speed disperser + basket mill

Focus: Large batches and frequent color changes.

UV / Electron-Beam Coatings

Suitable for: UV-curable coatings and coil coatings.

Viscosity: 500-2,000 mPa·s

Recommended line: Basket mill + vacuum letdown vessel

Focus: Fine finish and oxygen-inhibition control.

CAPACITY OPTIONS

Scale the line around the production plan.

Paint production line capacity options
ScaleBatch sizeDaily outputRecommended route
Laboratory5-20 LProcess trialsLaboratory disperser + small basket mill
Small production50-200 L200-500 kg/dayHigh-speed dispersion + basket milling
Medium production500-2,000 L1-5 t/dayDual dispersion + horizontal bead milling
Large production3,000-10,000 L5-20 t/dayIntegrated line with automatic controls

Not sure which capacity fits your needs?

Request a Line Design →

Which paint line fits your coating formulation?

Material PropertyBatch Line (Basket Mill)Continuous Line (Horizontal Bead Mill)Which to Choose?
Viscosity range1,000-50,000 mPa·s50-10,000 mPa·sHigh-viscosity coatings → batch
Target finenessD50: 1-5 µmD50: 0.1-1 µmFine industrial coating → continuous
Batch size50-1,000 L50-2,000 LSmaller project batches → batch
Color change frequency5-15 min cleaning30-90 min cleaningFrequent tint changes → batch
Annual outputBelow 500 tonsAbove 500 tonsHigh-volume coating → continuous
Capital costLowerHigherLimited budget → batch

WHY POLYC

One line, one accountable partner.

Single machine to turnkey line

Work with one engineering partner instead of coordinating multiple equipment suppliers.

Wet-grinding process experience

Process parameters are selected around pigment wetting, fineness, temperature, and cleaning needs.

Worldwide project support

Experience supplying equipment to more than 60 countries helps align the line to local plant needs.

Engineer-led delivery

Engineering support follows the project from design through commissioning and operator handover.

LINE DESIGN FAQ

Frequently Asked Questions

How long does it take to set up a paint production line?

After design confirmation, typical delivery takes 30 to 45 days. Installation and commissioning commonly take 7 to 15 days, depending on line scope and site readiness.

Can you provide a turnkey solution including installation?

Yes. POLYC MACHINE can provide a complete line from process design and manufacturing through installation guidance, commissioning, and handover.

What capacity options are available?

Configurations range from 5 L laboratory systems to large production lines with 10,000 L batches. The final capacity is selected around formulation, shift pattern, and output target.

Do you provide training for operators?

Yes. We provide on-site operating training and English operating manuals as part of the agreed project scope.

What is the typical lead time for a paint production line?

Standard line delivery is commonly 30 to 45 days after design confirmation. Custom automation, explosion-proof configuration, and site-specific scope may extend the final schedule.

How do you control color consistency across batches?

The process controls pigment weighing, premixing, milling energy, temperature, and letdown order. Retained standards and agreed viscosity, fineness, and color checks support repeatable batch release.

What options are available for water-based vs solvent-based coatings?

Water-based lines can prioritize corrosion-resistant contact parts, foam control, and washing. Solvent-based lines can add closed transfer, explosion-proof electrical equipment, grounding, ventilation connections, and compatible seals.

Can you handle high-viscosity architectural coatings?

Yes. High-torque dispersion, suitable vessel geometry, and basket-mill batch processing can be configured for high-solids or high-viscosity architectural coating formulations after a material review.

START YOUR PROJECT

Tell us about your paint project

Our engineer will help you design the right line.

Request a Line Design →
Get a Quote →WhatsApp